Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1938
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Nederlandsche Dok Maatschappij N V
The port or place in which the vessel’s construction took place, at the time of writing.
Amsterdam
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 7,40; Carrying Petroleum in Bulk; Oil Engine; +LMC 10,38; DBS 7,40; TS 7,40 CL
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3357
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Torpedoed and Sunk
Vessel’s area of loss or disposal/last known recorded location.
Dardanelles
Recorded date for the vessel’s loss or disposal.
07/06/1941
0000
Name of ship as recorded on the record
Alberta
The process of transferring a vessel to water, but not necessarily her completion.
03/09/1938
Unique identifier for a given ship, it is assigned by a builder.
69
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
Societe Anonyme Francaise des Petroles Shell
Date of the meeting of the Classing Committee.
21/10/1941
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
ated
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed by Submarine; Abandoned, Sunk
The country or national waters where a vessel is lost/disposed of, or last recorded.
Turkey
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.