Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

23/12/1941

The year in which a vessel’s construction is completed.

Year of ship completion

1941

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cia Uniao Fabril

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Lisbon

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

19

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Lisbon 3571

The date of first visit by a surveyor.

Date of first survey

24/07/1941

The individual and/or organisation listed

Ship owner

Loch Fishing Co (Director of Navy Contracts)

Location where the document is written.

Location of Document Creation

Nottingham

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Lis FE 3571

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Lincoln

Engine builder as written

Ruston & Hornsby Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Promise

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

20/09/1941

Unique identifier for a given ship, it is assigned by a builder.

Yard no

114

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Not

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4b Report on Oil Engine Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

23/12/1941

Name of the individual/entity/organisation responsible for authoring the record

Document author

J N Buchanan

Location where a vessel’s survey was undertaken.

Location of Survey

Lincoln

Date of the meeting of the Classing Committee.

Date of Classing committee

28/08/1942

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Vertical Solid Injection

Date in which construction of a vessel’s engines were completed.

Year of engine build

1941

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1