Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/12/1941
The year in which a vessel’s construction is completed.
1941
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cia Uniao Fabril
The port or place in which the vessel’s construction took place, at the time of writing.
Lisbon
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
18
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Lisbon 3554
The date of first visit by a surveyor.
15/07/1941
The individual and/or organisation listed
Loch Fishing Co (Director of Navy Contracts)
Location where the document is written.
Nottingham
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Lis FE 3554
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Lincoln
Ruston & Hornsby Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Port Madoc
The process of transferring a vessel to water, but not necessarily her completion.
28/05/1941
Unique identifier for a given ship, it is assigned by a builder.
113
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Not
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4b Report on Oil Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
09/12/1941
Name of the individual/entity/organisation responsible for authoring the record
J N Buchanan
Location where a vessel’s survey was undertaken.
Lincoln
Date of the meeting of the Classing Committee.
10/07/1942
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Vertical Solid Injection 7VGBM
Date in which construction of a vessel’s engines were completed.
1941
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.