Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/06/1950
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Craig Taylor & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Thornaby on Tees
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
24199
The port in which a vessel is registered or permanently based.
Panama
The date of first visit by a surveyor.
20/04/1950
The individual and/or organisation listed
Cia Naviera Punta Arenas S A
Location where the document is written.
Grimsby
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 12,48; SS St J 3rd No 3-8,44; SS Pir 1,49; Cargo Battens Not Fitted; +LMC 1,49; TS (CL) 10,48
Recorded information related to a vessel’s movements.
Immingham; River Tyne
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Sunderland
N E Marine Eng Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Struck a mine
Vessel’s place of loss or disposal/last known recorded location.
Terschelling
Recorded date for the vessel’s loss or disposal.
13/03/1950
Physical extent of a record.
1
Name of ship as recorded on the record
Cygnet
The process of transferring a vessel to water, but not necessarily her completion.
01/02/1911
Unique identifier for a given ship, it is assigned by a builder.
143
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gms
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
20/04/1950
Name of the individual/entity/organisation responsible for authoring the record
G C Vaux
Location where a vessel’s survey was undertaken.
Immingham
Date of the meeting of the Classing Committee.
15/09/1950
The name of the port/place of destination given.
River Tyne
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3726
Date in which construction of a vessel’s engines were completed.
1911
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Damaged by mine
4
The country or national waters where a vessel is lost/disposed of, or last recorded.
Netherlands
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.