Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/04/1912
The year in which a vessel’s construction is completed.
1913
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Priestman & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
7374
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
25/04/1912
Location where the document is written.
Middlesbrough
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on Hpl Rpt 14538
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded on Corsair Rocks
The country or national waters where a vessel is lost/disposed of, or last recorded.
Australia
Physical extent of a record.
1
Name of ship as recorded on the record
Time
The process of transferring a vessel to water, but not necessarily her completion.
18/07/1912
Unique identifier for a given ship, it is assigned by a builder.
238
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c., of Engines & Boilers
The date of first visit by a surveyor.
02/04/1912
Name of the individual/entity/organisation responsible for authoring the record
J Kerr
Location where a vessel’s survey was undertaken.
Middlesbrough
Date of the meeting of the Classing Committee.
14/02/1913
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Wrecked
Vessel’s area of loss or disposal/last known recorded location.
Port Philip Bay
Recorded date for the vessel’s loss or disposal.
23/08/1949
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.