Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

24/04/1936

The year in which a vessel’s construction is completed.

Year of ship completion

1915

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Barclay Curle & Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

4211

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

24216

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

24/04/1936

Name of the individual/entity/organisation responsible for authoring the record

Document author

William Rennie

Name of surveyor.

Surveyor

William Rennie

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Shade Dk; SS Dnz No 3-12,28; SS Dnz No 1,33

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

6852

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking Up Purposes

Physical extent of a record.

Number of parts

2

Name of ship as recorded on the record

Ship name

Gdynia

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

14/02/1915

Unique identifier for a given ship, it is assigned by a builder.

Yard no

512

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Pir

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

C11 Surveys for Freeboard

The port in which a vessel is registered or permanently based.

Port of registry

Gdynia

The date of first visit by a surveyor.

Date of first survey

23/04/1936

The individual and/or organisation listed

Ship owner

Gdynia American Shipping Lines Ltd

Location where the document is written.

Location of Document Creation

Piraeus

Location where a vessel’s survey was undertaken.

Location of Survey

Piraeus

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to vessel Pulaski

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.