Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

21/01/1944

The year in which a vessel’s construction is completed.

Year of ship completion

1905

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Canadian Government

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sorel P Q

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

544

The listed port to which a given vessel belongs.

Port belonging to

Montreal

The date of first visit by a surveyor.

Date of first survey

18/09/1942

The individual and/or organisation listed

Ship owner

Park Steamship Co

Location where the document is written.

Location of Document Creation

Saint John NB

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Minute on FE Rpt

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Dunston

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Name of ship as recorded on the record

Ship name

Riding Mountain Park

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1905

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

J M H Fraser

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

St.J

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

13 Report on Electrical Equipment

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

08/12/1943

Name of the individual/entity/organisation responsible for authoring the record

Document author

Charles B McGhee

Location where a vessel’s survey was undertaken.

Location of Survey

Saint John NB

Date of the meeting of the Classing Committee.

Date of Classing committee

21/04/1944

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

1854

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking Up

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

United Kingdom

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.