Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/12/1927
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
11b Surveys for Freeboard-Steam Ships
The port in which a vessel is registered or permanently based.
Glasgow
Name of the individual/entity/organisation responsible for authoring the record
E Oxley
Location where a vessel’s survey was undertaken.
Calcutta
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Pertinent, useful or interesting recorded content.
Also refers to Vessel Egra
Name of ship as recorded on the record
Ekma
The process of transferring a vessel to water, but not necessarily her completion.
21/10/1911
Unique identifier for a given ship, it is assigned by a builder.
308
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cal
Additional numbers that feature on a given record that may be used for identification.
22032
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Calcutta
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Shade Deck
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5108
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Broken up
Physical extent of a record.
3
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.