Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/08/1855
The year in which a vessel’s construction is completed.
1855
The port or place in which the vessel’s construction took place, at the time of writing.
Sackville, New Brunswick
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The individual and/or organisation listed
N S De Mill
Name of the individual/entity/organisation responsible for authoring the record
John Tucker
Location where a vessel’s survey was undertaken.
Sackville, New Brunswick
Date of the meeting of the Classing Committee.
29/08/1856
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
514 73 /100
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Harrowby
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1855
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
St John 157
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J G Hoyle
Location where the document is written.
Sackville, New Brunswick
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Left blank
The name of the port/place of destination given.
Liverpool
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.