Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/06/1859
The process of transferring a vessel to water, but not necessarily her completion.
17/02/1859
The port or place in which the vessel’s construction took place, at the time of writing.
Rye
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of surveyor.
James Martin; William C Davey
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The year in which a vessel’s construction is completed.
1859
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hessell & Holmes
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
Name of the individual/entity/organisation responsible for authoring the record
Thomas William Wawn; James Martin; William C Davey
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Wood
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1