Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
17/01/1855
The year in which a vessel’s construction is completed.
1855
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dennis Ansley Douglas
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
The individual and/or organisation listed
G H Hicks
Location where the document is written.
Sunderland
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
1855
Pertinent, useful or interesting recorded content.
Also refers to vessel Queen of Ava
Name of ship as recorded on the record
Hastings
The process of transferring a vessel to water, but not necessarily her completion.
18/11/1855
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Swanston & Weatherley
The name of the port/place of destination given.
Madras
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Predominant material(s) utilised in a vessel’s construction.
Wood
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
595
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.