Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1899
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Thompson & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 3738a HC
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Hugh Cameron
Name of surveyor.
Hugh Cameron
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
The North Eastern Marine Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Engine Forgings No 3738a; Manufactured by The Darlington Forge Co of Darlington
Name of ship as recorded on the record
Lynalder
The process of transferring a vessel to water, but not necessarily her completion.
12/01/1899
Unique identifier for a given ship, it is assigned by a builder.
206
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Sunderland 19567
The date of first visit by a surveyor.
16/09/1898
Location where the document is written.
Sunderland
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Sunderland
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.