Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/06/1884
The year in which a vessel’s construction is completed.
1884
The port or place in which the vessel’s construction took place, at the time of writing.
Vlissingen
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Machinery
The listed port to which a given vessel belongs.
Liverpool
The date of first visit by a surveyor.
30/10/1883
The individual and/or organisation listed
Edward A Cohen
Name of the individual/entity/organisation responsible for authoring the record
W F D van Ollefen
Name of surveyor.
Willem F D van Ollefen
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
The country, at the time of writing, where a vessel’s engines were constructed.
The Netherlands
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
90
Name of ship as recorded on the record
Wolf - 1883
The process of transferring a vessel to water, but not necessarily her completion.
19/04/1884
The country in which the vessel’s construction took place, at the time of writing.
The Netherlands
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
U
The date of last visit by a surveyor.
14/06/1884
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J W Brown
Location where the document is written.
Flushing
Location where a vessel’s survey was undertaken.
Flushing
Predominant material(s) utilised in a vessel’s construction.
Iron
Location of construction for a vessel’s engines.
Vlissingen
Date in which construction of a vessel’s engines were completed.
1883
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.