Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
17/07/1877
The process of transferring a vessel to water, but not necessarily her completion.
__/07/1877
The port or place in which the vessel’s construction took place, at the time of writing.
Bideford
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The date of first visit by a surveyor.
19/06/1875
The individual and/or organisation listed
William Richards
Name of the individual/entity/organisation responsible for authoring the record
Richard Sloggett
Location where a vessel’s survey was undertaken.
Prince Edward Island
Date of the meeting of the Classing Committee.
16/10/1877
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
The year in which a vessel’s construction is completed.
1877
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Richards
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1222
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
17/07/1877
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Benjamin E Holman
Location where the document is written.
Prince Edward Island
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A- for 10 years; CF; salted
The name of the port/place of destination given.
Bristol
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.