25/10/1894
The year in which a vessel’s construction is completed.
1895
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong Mitchell & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle on Tyne
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 3491B JC
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
25/10/1894
Location where the document is written.
Newcastle
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
St Peters
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Fort Salisbury
The process of transferring a vessel to water, but not necessarily her completion.
27/10/1894
Unique identifier for a given ship, it is assigned by a builder.
620
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
45 Engine Forgings or Castings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 31623
The date of first visit by a surveyor.
04/07/1894
Name of the individual/entity/organisation responsible for authoring the record
John C Craig
Name of surveyor.
John C Craig
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
R & W Hawthorn Leslie & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Engine Forgings or Castings No 2291; Manufactured by Hawthorn Leslie & Co of Hebburn