Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

09/08/1892

The year in which a vessel’s construction is completed.

Year of ship completion

1892

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

R & W Hawthorn Leslie & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Lloyd's 1171B JC

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

08/08/1892

Location where the document is written.

Location of Document Creation

Newcastle

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Location of construction for a vessel’s engines.

Location of engine build

St Peters

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Port Melbourne

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/10/1892

Unique identifier for a given ship, it is assigned by a builder.

Yard no

312

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

45 Engine Forgings or Castings

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Newcastle 27975

The date of first visit by a surveyor.

Date of first survey

26/04/1892

Name of the individual/entity/organisation responsible for authoring the record

Document author

John C Craig

Name of surveyor.

Surveyor

John C Craig

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Engine builder as written

Hawthorn Leslie & Co

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Engine Forgings or Castings No 1244; Manufactured by Hawthorn Leslie & Co of Hebburn

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.