Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/10/0000
The year in which a vessel’s construction is completed.
1883
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Campbell, Macintosh & Bowstead
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 385 5/83 HC; Lloyd's 385 7/83 HC; Lloyd's 385 10/83 HC
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
26/10/0000
Location where the document is written.
Sunderland
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Iron
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Saint Asaph
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1883
Unique identifier for a given ship, it is assigned by a builder.
13
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on ship forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 17433
The date of first visit by a surveyor.
22/05/0000
Name of the individual/entity/organisation responsible for authoring the record
Hugh Cameron
Name of surveyor.
Hugh Cameron
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Report on Ship Forgings No 385; Manufactured by Casley & Birkett of Newcastle
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.