Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/06/1834
The year in which a vessel’s construction is completed.
1815
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Additional numbers that feature on a given record that may be used for identification.
78
The individual and/or organisation listed
J Eden
Location where the document is written.
South Shields
Physical arrangement of a ship’s masts, sails and rigging.
Sw - Snow
Type of fuel used onboard a vessel.
Sail - Rigs
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
coal
Pertinent, useful or interesting recorded content.
States that the vessel received repairs in 1829 at Yarmouth to a sum of £900; her topsides were renewed at Norway with Norwegian oak, with other repairs to her hull to an overall cost of £500; in 1834 owner states that the vessel was totally dismasted in April of the coal taken to Hull and there remasted, rigged and provided with new sails
Name of ship as recorded on the record
Comet
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
U
Name of the individual/entity/organisation responsible for authoring the record
J Eden
Recorded information related to a vessel’s movements.
Newcastle-upon-Tyne; Sunderland, Yarmouth; Norway; Hull
A vessel’s means of propulsion.
Sail
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
240
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.