Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/03/1898
The year in which a vessel’s construction is completed.
1897
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ramage & Ferguson Ltd
Unique identifier for a given ship, it is assigned by a builder.
153
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lth
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Lighting Installation
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
18/03/1898
Name of the individual/entity/organisation responsible for authoring the record
William Paulsen
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1898
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Ronan
The process of transferring a vessel to water, but not necessarily her completion.
10/09/1897
Name of the shipbuilder as it appears on the record.
Alex & Ferguson
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
8678
The listed port to which a given vessel belongs.
Leith
The date of first visit by a surveyor.
09/12/1897
The individual and/or organisation listed
George Gibson & Co
Location where the document is written.
Leith
Predominant material(s) utilised in a vessel’s construction.
Iron
Type and configuration of the engine(s) supplied for a vessel.
Compound Would Dynamo Coupled Direct to Open Type Double Acting Engine
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.