Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/02/1882
The year in which a vessel’s construction is completed.
1869
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harvey
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Annual Surveys
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
03/02/1882
The individual and/or organisation listed
D E Putron & Co
Name of the individual/entity/organisation responsible for authoring the record
Christopher Besant
Name of surveyor.
Christopher Besant
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Contd 4A1
Recorded information related to a vessel’s movements.
London; Grenada
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Chocolate Girl
The process of transferring a vessel to water, but not necessarily her completion.
__/08/1869
The port or place in which the vessel’s construction took place, at the time of writing.
Littlehampton
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
41150
Other/additional record(s) specifically mentioned, referenced or associated to another record.
London 39612
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
03/02/1882
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W Folster
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
10/02/1882
The name of the port/place of destination given.
Grenada
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
253
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.