Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/01/1867
The year in which a vessel’s construction is completed.
1852
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs
The listed port to which a given vessel belongs.
Leith
The date of first visit by a surveyor.
02/01/1867
The individual and/or organisation listed
W Thompson
Name of the individual/entity/organisation responsible for authoring the record
Joseph Keen; Thomas William Wawn
Name of surveyor.
Joseph Keen
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
10A1 count 62 7 years
The name of the port/place of destination given.
Jamaica
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Lancashire Witch
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
28027
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Ramsgate 224
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
02/01/1867
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
D Morrison
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Recorded information related to a vessel’s movements.
London; Jamaica
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
283
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.