Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

05/03/1861

The year in which a vessel’s construction is completed.

Year of ship completion

1832

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

R Tindall

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Lon

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Annual Surveys

The listed port to which a given vessel belongs.

Port belonging to

Scarborough

The individual and/or organisation listed

Ship owner

Mosey & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

Bernard Waymouth

Name of surveyor.

Surveyor

Bernard Waymouth

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 in Red; Record YM

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1861

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Jabez

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1832

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Scarborough

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

23791

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Leith 2926

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

S Sedman

Location where the document is written.

Location of Document Creation

London

Location where a vessel’s survey was undertaken.

Location of Survey

London

Date of the meeting of the Classing Committee.

Date of Classing committee

22/03/1861

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Bg - Brig

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

222

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1861

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Surveys for two ships on document. Other ship is Anglo Saxon; LRF-PUN-LON644-0082b-R_0001; London 23791

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.