Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/12/1858
The year in which a vessel’s construction is completed.
1853
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
22918
Other/additional record(s) specifically mentioned, referenced or associated to another record.
London 20418
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
09/12/1858
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J Chapman
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
10/02/1860
The name of the port/place of destination given.
Swan River
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Robert Morrison
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1853
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
24/09/1858
The individual and/or organisation listed
Wilson & Oliver
Name of the individual/entity/organisation responsible for authoring the record
Thomas William Wawn; William C Davey; William T Mumford
Name of surveyor.
William C Davey; William T Mumford
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
13A1; record repair
Recorded information related to a vessel’s movements.
London; Swan River
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
610
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.