Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
13/10/1851
The year in which a vessel’s construction is completed.
1839
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs
The listed port to which a given vessel belongs.
Swansea
The date of first visit by a surveyor.
13/09/1851
The individual and/or organisation listed
J Beynon
Name of the individual/entity/organisation responsible for authoring the record
Joseph Horatio Ritchie; Peter Courtenay
Name of surveyor.
Joseph Horatio Ritchie; Peter Courtenay
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
12A1 Contd 4A1; record repairs
Physical arrangement of a ship’s masts, sails and rigging.
Bg - Brig
Predominant material(s) utilised in a vessel’s construction.
Wood
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
205
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Elizabeth Beynon
The port or place in which the vessel’s construction took place, at the time of writing.
Poole
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
17100
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Swansea 444
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
13/10/1851
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Bevan
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
21/10/1851
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
222
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.