Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

06/05/1844

The year in which a vessel’s construction is completed.

Year of ship completion

1839

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Whitemore

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Lon

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

21/04/1844

The individual and/or organisation listed

Ship owner

Vaughan & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

Nathaniel Middleton

Name of surveyor.

Surveyor

Nathaniel Middleton

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

AE1; S S 44 - 4 years

Recorded information related to a vessel’s movements.

Voyage information

London; Honduras

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Bk - Barque

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

593

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Agnes

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/05/1839

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

New Brunswick

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

10618

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Liverpool 4461

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

06/05/1844

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

J Mitcalf

Location where the document is written.

Location of Document Creation

London

Location where a vessel’s survey was undertaken.

Location of Survey

London

Date of the meeting of the Classing Committee.

Date of Classing committee

10/05/1844

The name of the port/place of destination given.

Destined voyage

Honduras

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.