Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/03/1836
The year in which a vessel’s construction is completed.
1835
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Price
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
The name of the port/place of destination given.
Jamaica
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Ralph Bernal
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hutchinson
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
The listed port to which a given vessel belongs.
London
The individual and/or organisation listed
Mackerness
Name of the individual/entity/organisation responsible for authoring the record
Peter Courtenay
Name of surveyor.
Peter Courtenay
Recorded information related to a vessel’s movements.
London; Jamaica
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
314
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.