Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/09/1834
The year in which a vessel’s construction is completed.
1827
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barnard
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
639
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Briggs
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
The name of the port/place from which a vessel’s voyage originated.
London
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
502
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Tullock Castle
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1827
The port or place in which the vessel’s construction took place, at the time of writing.
London
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The individual and/or organisation listed
Davidson & Co
Name of the individual/entity/organisation responsible for authoring the record
P Courtenay
Name of surveyor.
Peter Courtenay
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
12A1
The name of the port/place of destination given.
Jamaica
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.