Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The process of transferring a vessel to water, but not necessarily her completion.
04/12/1884
Unique identifier for a given ship, it is assigned by a builder.
222
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Predominant material(s) utilised in a vessel’s construction.
Iron
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
The year in which a vessel’s construction is completed.
1884
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J & G Thomson
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Liverpool 37027; Liverpool 37028; Liverpool 37029; Liverpool 37030; Liverpool 37031; Liverpool 37032; Liverpool 37033; Liverpool 37034; Liverpool 37035; Liverpool 37036; Liverpool 37037; Liverpool 37038; Liverpool 37039; Liverpool 37040; Liverpool 37041;
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.