Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/11/1838
The year in which a vessel’s construction is completed.
1836
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
G A Cannon
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Aitcheson
Location where the document is written.
Liverpool
Location where a vessel’s survey was undertaken.
Liverpool
Date of the meeting of the Classing Committee.
04/12/1838
The name of the port/place of destination given.
Philadelphia
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Britannia
The process of transferring a vessel to water, but not necessarily her completion.
__/10/1836
The port or place in which the vessel’s construction took place, at the time of writing.
Portland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2558
The listed port to which a given vessel belongs.
St. John, N.B.
The individual and/or organisation listed
Weshart
Name of the individual/entity/organisation responsible for authoring the record
Robert Hamilton
Name of surveyor.
Robert Hamilton
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 4 Years
Recorded information related to a vessel’s movements.
Liverpool; Philadelphia
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Predominant material(s) utilised in a vessel’s construction.
Iron
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
769
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.