Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/01/1870
The year in which a vessel’s construction is completed.
1862
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Oswald
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engineer's Certificate
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
George Shetliff
Location where the document is written.
Hull
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Single Direct Acting Inverted Compound Engine with High & One Low Pressure Cylinder
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Viceroy
The process of transferring a vessel to water, but not necessarily her completion.
__/07/1862
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 7660
The individual and/or organisation listed
Bailey & Leetham
Name of the individual/entity/organisation responsible for authoring the record
Gilbert & Cooper; Neptune Iron Works
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
938
R & W Hawthorn
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.