Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

04/12/1880

The year in which a vessel’s construction is completed.

Year of ship completion

1853

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Joyce & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

London

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

28671

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Hull 186

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

04/12/1880

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Nelson

Location where the document is written.

Location of Document Creation

Hull

Location where a vessel’s survey was undertaken.

Location of Survey

Hull

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Vertical Inverted Direct Acting Compound

Date in which construction of a vessel’s engines were completed.

Year of engine build

1880

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Thunder

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1853

The name of the yard where the vessel was built.

Yard name

Greenwich

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Irn

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report on Machinery

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

06/11/1880

The individual and/or organisation listed

Ship owner

L Watkins

Name of the individual/entity/organisation responsible for authoring the record

Document author

John B Stevens

Name of surveyor.

Surveyor

John B Stevens

Date of the meeting of the Classing Committee.

Date of Classing committee

25/02/1881

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

598

Location of construction for a vessel’s engines.

Location of engine build

Hull

Engine builder as written

C D Holmes & Co

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.