Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
12/11/1879
The year in which a vessel’s construction is completed.
1876
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Blackwood & Gordon
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 25387
The individual and/or organisation listed
Steamship Co
Name of the individual/entity/organisation responsible for authoring the record
James G McCulloch; Alexander Gray
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Compound, Inverted, Direct Acting, Two (2) Cylrs
Date in which construction of a vessel’s engines were completed.
1877
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Emu
The process of transferring a vessel to water, but not necessarily her completion.
16/09/1876
Unique identifier for a given ship, it is assigned by a builder.
139
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engineer's Certificate
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Robert W Osborne
Location where the document is written.
Adelaide
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
392
Location of construction for a vessel’s engines.
Port Glasgow
Blackwood & Gordon
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.