Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/03/1878
The year in which a vessel’s construction is completed.
1862
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
S & M Morton & Co
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c.
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 18721
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/03/1878
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
O P Watson
Location where the document is written.
Hull
Location where a vessel’s survey was undertaken.
Hull
Date of the meeting of the Classing Committee.
12/03/1878
The name of the port/place of destination given.
Marseilles
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Fingal
The process of transferring a vessel to water, but not necessarily her completion.
23/12/1862
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
20481
Additional numbers that feature on a given record that may be used for identification.
Hull 4623
The listed port to which a given vessel belongs.
Hull
The date of first visit by a surveyor.
01/03/1878
The individual and/or organisation listed
William Tully & Co
Name of the individual/entity/organisation responsible for authoring the record
James McNeil
Name of surveyor.
James McNeil
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
90A1; Drp 78
Recorded information related to a vessel’s movements.
Hull; Marseilles
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
948
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.