Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/01/1878
The year in which a vessel’s construction is completed.
1877
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Palmers Shipbuilding & Iron Co
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engineer Surveyor's Report on Machinery
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 19991
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
George W Manuel
Name of surveyor.
George W Manuel
Predominant material(s) utilised in a vessel’s construction.
Iron
Type and configuration of the engine(s) supplied for a vessel.
Two Cylinder Compound Inverted Surface Condensing
Date in which construction of a vessel’s engines were completed.
1878
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
North Britain
The process of transferring a vessel to water, but not necessarily her completion.
18/11/1877
Unique identifier for a given ship, it is assigned by a builder.
356
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Additional numbers that feature on a given record that may be used for identification.
Newcastle 13826
The listed port to which a given vessel belongs.
London
The individual and/or organisation listed
Hugh Roberts
Location where the document is written.
Jarrow-on-Tyne
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Jarrow On Tyne
Palmers Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.