Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/05/1877
The year in which a vessel’s construction is completed.
1870
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Palmers Co
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
18462
Additional numbers that feature on a given record that may be used for identification.
Newcastle 13584
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
08/02/1877
The individual and/or organisation listed
Hall Bros
Name of the individual/entity/organisation responsible for authoring the record
William Moverly
Name of surveyor.
William Moverly
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
90A1
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Cartago Nova
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1870
Unique identifier for a given ship, it is assigned by a builder.
238
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Annual Surveys
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 15578
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
29/05/1877
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R Gillon
Location where the document is written.
Newcastle
Location where a vessel’s survey was undertaken.
Newcastle
Date of the meeting of the Classing Committee.
01/06/1877
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1630
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Surveys for two ships on document. Other ship is Lord Eslington; LRF-PUN-IRON472-0060b-R; IRON 18462
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.