Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/06/1876
The year in which a vessel’s construction is completed.
1871
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A McMillan & Son
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs of Engines and Boiler
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed
Submarine Telegraph Co
Location where the document is written.
Ramsgate
Location where a vessel’s survey was undertaken.
Dover
Date of the meeting of the Classing Committee.
20/06/1876
Is the steamer assisted by sail?
No
J & J Thomson
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
The Lady Carmichael
The process of transferring a vessel to water, but not necessarily her completion.
07/03/1871
The port or place in which the vessel’s construction took place, at the time of writing.
Dumbarton
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
16585
The listed port to which a given vessel belongs.
London
The date of last visit by a surveyor.
19/06/1876
Name of the individual/entity/organisation responsible for authoring the record
William Parker
Name of surveyor.
William Parker
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Lloyd's MC
A vessel’s means of propulsion.
Steam
Location of construction for a vessel’s engines.
Glasgow
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.