Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/08/1876
The year in which a vessel’s construction is completed.
1863
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Marshall
The name of the yard where the vessel was built.
Jarrow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engineer Surveyor's Report on Machinery
The listed port to which a given vessel belongs.
Antwerp
The individual and/or organisation listed
David Verbist & Co
Location where the document is written.
Antwerp
Predominant material(s) utilised in a vessel’s construction.
Iron
Type and configuration of the engine(s) supplied for a vessel.
Vertical Inverted Surface Condensing
Date in which construction of a vessel’s engines were completed.
1863
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Pauline David
The process of transferring a vessel to water, but not necessarily her completion.
__/10/1863
Unique identifier for a given ship, it is assigned by a builder.
298
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Antwerp 418; Iron 16430
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
F Demblon
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
South Shields
Marshall Bros
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.