Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/04/1876
The year in which a vessel’s construction is completed.
1872
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Charles Mitchell & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 13192; Iron 16303
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
James Bain
Name of surveyor.
James Bain
Predominant material(s) utilised in a vessel’s construction.
Iron
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Direct Acting
Date in which construction of a vessel’s engines were completed.
1872
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Nankin
The process of transferring a vessel to water, but not necessarily her completion.
23/07/1872
Unique identifier for a given ship, it is assigned by a builder.
2
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engineer Surveyor's Report on Machinery
The listed port to which a given vessel belongs.
London
The individual and/or organisation listed
Watts Millburn & Co
Location where the document is written.
Newcastle on Tyne; Newcastle
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
London
Maudslay Sons & Field
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.