Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
31/08/1835
The year in which a vessel’s construction is completed.
1806
The port or place in which the vessel’s construction took place, at the time of writing.
Yarmouth
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Stommers
Location where the document is written.
Ipswich
Location where a vessel’s survey was undertaken.
Ipswich
Date of the meeting of the Classing Committee.
29/09/1835
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
59
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Providence
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1806
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
58
Additional numbers that feature on a given record that may be used for identification.
262
The individual and/or organisation listed
Capt & Co
Name of the individual/entity/organisation responsible for authoring the record
W R Mulley
Name of surveyor.
W R Mulley
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AE1
The name of the port/place from which a vessel’s voyage originated.
Ipswich
Physical arrangement of a ship’s masts, sails and rigging.
Sk - Smack
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.