Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

19/09/1896

The year in which a vessel’s construction is completed.

Year of ship completion

1896

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Murdoch & Murray

Unique identifier for a given ship, it is assigned by a builder.

Yard no

146

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Grk

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report on Electric Lighting Installation

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

19/09/1896

Name of the individual/entity/organisation responsible for authoring the record

Document author

S A G Nash; R J Beveridge

Name of surveyor.

Surveyor

S A G Nash

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Sr - Schooner

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

One Open Fronted Automatic Engine of the double acting type

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Cidade de Manaos

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/09/1896

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Murdoch & Murray

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

11553

The listed port to which a given vessel belongs.

Port belonging to

Para

The date of first visit by a surveyor.

Date of first survey

16/09/1896

The individual and/or organisation listed

Ship owner

Marques Braga & Co

Location where the document is written.

Location of Document Creation

Greenock

Location where a vessel’s survey was undertaken.

Location of Survey

Greenock

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.