Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/02/1886
The year in which a vessel’s construction is completed.
1886
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Charles Connell & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 1168 GN
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
22/02/1886
Location where the document is written.
Glasgow
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Ship Forgings or Castings No 1168; Manufactured by C Connall & Co of Glasgow
Name of ship as recorded on the record
Earl of Aberdeen
The process of transferring a vessel to water, but not necessarily her completion.
31/07/1886
Unique identifier for a given ship, it is assigned by a builder.
145
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Ship Forgings or Castings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Glasgow 7592
The date of first visit by a surveyor.
03/12/1885
Name of the individual/entity/organisation responsible for authoring the record
George Newcomb
Name of surveyor.
George Newcomb
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Predominant material(s) utilised in a vessel’s construction.
Iron
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.