Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/12/1838
The process of transferring a vessel to water, but not necessarily her completion.
__/06/1837
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
Dublin 177
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
U
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
James Quinn
Location where the document is written.
Dublin
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Classing deferred
The name of the port/place of destination given.
St Johns, New Brunswick
Physical arrangement of a ship’s masts, sails and rigging.
Bg - Brig
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
The year in which a vessel’s construction is completed.
1837
The port or place in which the vessel’s construction took place, at the time of writing.
Prince Edward Island
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The individual and/or organisation listed
Richard & Mary Allen
Name of the individual/entity/organisation responsible for authoring the record
Robert Morton
Location where a vessel’s survey was undertaken.
Dublin
Date of the meeting of the Classing Committee.
30/03/1838
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
223 570 /3500
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.