Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

__/__/0000

The year in which a vessel’s construction is completed.

Year of ship completion

1850

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Sloan & Gemmell

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Note

The listed port to which a given vessel belongs.

Port belonging to

undefined

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Thomas Abernethy

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Felix

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/05/1850

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Ayr

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Clyde 2780

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.