Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/11/1834
The year in which a vessel’s construction is completed.
1817
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Steele & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The individual and/or organisation listed
Robert Bogle & Co
Name of the individual/entity/organisation responsible for authoring the record
John Barr Cumming
Location where a vessel’s survey was undertaken.
Greenock
Date of the meeting of the Classing Committee.
13/12/1834
Recorded information related to a vessel’s movements.
Clyde
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Glasgow
The process of transferring a vessel to water, but not necessarily her completion.
29/09/1817
The name of the yard where the vessel was built.
Bay of Quick
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
87
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
U
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Milrea
Location where the document is written.
Greenock
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AE1
The name of the port/place from which a vessel’s voyage originated.
Clyde
The name of the port/place of destination given.
Jamaica
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
338
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.