Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/09/1898
The year in which a vessel’s construction is completed.
1898
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Sons & Maxim Ltd
Unique identifier for a given ship, it is assigned by a builder.
266
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Brw
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
23/09/1898
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W R Cato
Location where the document is written.
Barrow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9,98; Elec light
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6514
Location of construction for a vessel’s engines.
Barrow
Vickers Sons & Maxim Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1898
Name of ship as recorded on the record
Anglia
The process of transferring a vessel to water, but not necessarily her completion.
20/06/1898
Name of the shipbuilder as it appears on the record.
A Adamson
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
849
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
27/10/1897
The individual and/or organisation listed
Telegraph Construction & Maintenance Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
James Easthope
Location where a vessel’s survey was undertaken.
Barrow
Date of the meeting of the Classing Committee.
01/11/1898
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion (Twin Screw)
Date in which construction of a vessel’s engines were completed.
1898
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
r 1898
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.