Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/04/1887
The year in which a vessel’s construction is completed.
1887
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barrow Shipbuilding Co Ltd
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
143
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/04/1887
Name of the individual/entity/organisation responsible for authoring the record
C Buchanan; D Ritchie
Name of surveyor.
Duncan Ritchie
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1
The name of the port/place of destination given.
London
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
989.55
Location of construction for a vessel’s engines.
Barrow
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Bazalgette
The process of transferring a vessel to water, but not necessarily her completion.
25/05/1887
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The date of first visit by a surveyor.
21/08/1886
The individual and/or organisation listed
Metropolitan Board of Works
Location where the document is written.
Barrow
Location where a vessel’s survey was undertaken.
Barrow
Date of the meeting of the Classing Committee.
28/06/1887
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Iron screw, triple expansion, three cranks
Date in which construction of a vessel’s engines were completed.
1887
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.