Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/11/1839
The year in which a vessel’s construction is completed.
1839
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Jones
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Brs
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Edwards
Location where the document is written.
Bristol
Location where a vessel’s survey was undertaken.
Bristol
Date of the meeting of the Classing Committee.
29/11/1839
The name of the port/place of destination given.
Corn Trade
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Ashley
The process of transferring a vessel to water, but not necessarily her completion.
__/10/1839
The port or place in which the vessel’s construction took place, at the time of writing.
Chepstow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
399
The listed port to which a given vessel belongs.
Bristol
The individual and/or organisation listed
Stone & Co
Name of the individual/entity/organisation responsible for authoring the record
George Bayley
Name of surveyor.
George Bayley
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 10 years
Recorded information related to a vessel’s movements.
Bristol; Corn Trade
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
81
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.