Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
20/06/1898
The year in which a vessel’s construction is completed.
1898
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
146
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
QFBM
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4869
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Belfast 4795
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
15/06/1898
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Houlder Bros & Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
A L Jones
Name of surveyor.
A L Jones
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 (steel); spar deck; 1 DK (stl) & spar deck (stl); +LMC 6,98; Elect li
Recorded information related to a vessel’s movements.
Belfast; Australia; South America
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Beacon Grange
The process of transferring a vessel to water, but not necessarily her completion.
25/01/1898
Name of the shipbuilder as it appears on the record.
J A MacNaughton
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
07/11/1896
The individual and/or organisation listed
Beacon Grange Steam Ship Co Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Robert Taylor
Location where the document is written.
Belfast
Location where a vessel’s survey was undertaken.
Belfast
Date of the meeting of the Classing Committee.
24/06/1898
The name of the port/place of destination given.
Australia; South America
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4042
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.