Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/05/1849
The year in which a vessel’s construction is completed.
1849
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A Hall & Co
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
Aberdeen 1363
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
D M Grath
Location where the document is written.
Aberdeen
Location where a vessel’s survey was undertaken.
Aberdeen
Date of the meeting of the Classing Committee.
18/05/1849
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
425; 367
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Benjamin Elkin
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1849
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The individual and/or organisation listed
Joseph Brandies & Co
Name of the individual/entity/organisation responsible for authoring the record
Thomas Alexander
Name of surveyor.
Thomas Alexander
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 10 years
The name of the port/place of destination given.
New South Wales
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.