Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/11/1897
The year in which a vessel’s construction is completed.
1890
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R Craggs & Sons
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Abn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines and Boilers
The listed port to which a given vessel belongs.
Middlesbrough
The date of first visit by a surveyor.
02/11/1897
The individual and/or organisation listed
Constantine Pickering & Co
Name of the individual/entity/organisation responsible for authoring the record
Maurice Ritson
Name of surveyor.
Maurice Ritson
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 7.97; S S 11,97
Recorded information related to a vessel’s movements.
Aberdeen; Middlesbrough
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Middlesbrough
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Sam Handford
The process of transferring a vessel to water, but not necessarily her completion.
__/08/1890
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5647
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Middlesbrough 2192
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/11/1897
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
McGregor
Location where the document is written.
Aberdeen
Location where a vessel’s survey was undertaken.
Aberdeen
Date of the meeting of the Classing Committee.
12/11/1897
The name of the port/place of destination given.
Middlesbrough
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1832
Date in which construction of a vessel’s engines were completed.
1890
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.